Posted on

3 Story FasWall Construction at Yachats Brewing

3 Story FasWall Construction at Yachats Brewing

Nathan Bernard, owner of the Yachats Farm Store and Yachats Brewing is in the middle of constructing a 3 story addition using the FasWall blocks. We got to spend a day with him as he began applying the first coat of interior stucco (Stucco Core Mix). Watch the video below where he gives a tour of the project and explains the construction process.   Nathan used a 4 Jet Combo Blaster to apply the stucco while a second crew member followed behind troweling the wall to a consistent 3/8″ layer. The scratch coat was followed by the brown coat, also 3/8″ and the finish coat 1/4″. The sand Nathan started with was a sharp mixed grade gray sand that had some aggregate that was quite large that worked fine for the scratch and brown coat. Nathan wanted the final coat to be as white as possible so they used a white portland cement and a mixed grade sharp white sand. Yachats Brewing plans to begin operation this October. Until then the Farm Store is open serving lunch 11-3 and offering over a dozen brews from Western Oregon. You can learn more about the FasWall system at FasWall.com or call (855) 558-4588 and ask for Tom. If you’re looking for a sprayer or stucco mix for your next project give us a call at (541) 683-4167 or email info@MortarSprayer.com.

 faswall yachats brewing construction 2Nathan spraying the HERB-CRETE Stucco.

faswall yachats brewing construction 3Nathan spraying his first wall.

faswall yachats brewing construction 4Spray, Trowel, Spray, Trowel…

faswall yachats brewing construction 5Local, organic heirloom tomatoes!

faswall yachats brewing construction 6List of current brews on tap.

faswall yachats brewing construction 7

faswall yachats brewing construction 8Back troweling the first coat of stucco to create greater adhesion with the second coat.